Highway

[vc_row row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" css_animation=""][vc_column][vc_video link="https://www.youtube.com/watch?v=TYUUnphp-TQ" align="center"][vc_column_text]Video courtesy of USDOTFHWA.[/vc_column_text][vc_empty_space][action full_width="yes" content_in_grid="yes" type="simple" text_font_weight="" show_button="yes" button_target="_self" button_text="Get In Touch" button_link="https://bridgepreservation.com/contact/" background_color="#81d742" button_hover_background_color="#81d742" button_hover_border_color="#ffffff" button_hover_text_color="#ffffff" button_text_color="#6fad35"]Learn more about our high performance waterproofing systems[/action][vc_empty_space][vc_column_text]We are proud to be a part of the innovative plans of the Pennsylvania DOT to protect its structures.  Every state has its own STIC program,initiated by the Federal Highway Administration (FHWA), the STIC puts highway community stakeholders in each state in the driver’s seat to choose the innovations that best fit their needs and get those innovations into practice quickly.  PHILADELPHIA, PA, OCT 17 2016 -- Initiated by the Federal Highway Administration (FHWA), the State Transportation Innovation Council (STIC) puts highway community stakeholders in each state in the driver’s seat to choose the innovations that best fit their needs and get those innovations into practice quickly.

BOSTON, MA - March 11, 2014 - The 53-year-old Callahan Tunnel was closed shortly after Christmas 2013 for a multi-million dollar renovation project. The floor had badly deteriorated, and after a wall panel fell in 2012, many more were soon discovered to be defective. Because the main thruway to East Boston and Logan International Airport carries 30,000 cars a day, many drivers and area businesses were concerned a three month closure would cause massive traffic problems and delays.

CITY OF TORONTO, ONTARIO, CANADA - As part of the 86,000 square foot Georgetown South Project, Bridge Tite Group, an Approved Applicator of Bridge Preservation LLC. installed the BDM spray applied tunnel waterproofing membrane on the top of the Metrolinx Weston Tunnel, which travels under King Street carrying the GO tracks.

Bridge Preservation™ BD Top Coat Cold Liquid Spray Applied Waterproofing MembraneThe Oregon DOT utilizes a fast curing, high performance, high friction spray applied waterproofing membrane on the OR22 Marion Street Bridge over the Willamette River.
 
SALEM, OREGON - The Marion Street Bridge is a steel plate girder bridge with Gothic arched piers.  When opened in 1953 it was the largest plate girder bridge west of the Mississippi River, spanning a total length of 2,393 feet.